Home > Term: net change master scheduling
net change master scheduling
A master scheduling principle in which net requirements are calculated only for items that have had a change in demand since the last master schedule was calculated.
- Μέρος του λόγου: noun
- Κλάδος/Τομέας: Software
- Category: Operating systems
- Company: Microsoft
0
Δημιουργός
- Maxiao
- 100% positive feedback