Home >  Term: net change master scheduling
net change master scheduling

A master scheduling principle in which net requirements are calculated only for items that have had a change in demand since the last master schedule was calculated.

0 0

Δημιουργός

  • Romain
  •  (V.I.P) 17515 points
  • 44.44% positive feedback
© 2024 CSOFT International, Ltd.