Home >  Term: available but not needed capability
available but not needed capability

Net capability of main generating units that are operable but not considered necessary to carry load and cannot be connected to load within 30 minutes.

0 0

Δημιουργός

  • Pud6
  •  (Gold) 2324 points
  • 100% positive feedback
© 2025 CSOFT International, Ltd.