Home >  Term: actual cost
actual cost

In rate base determination. See ORIGINAL COST, HISTORICAL COST, WEIGHTED COST.

0 0

Δημιουργός

  • JJD
  •  (Gold) 2369 points
  • 100% positive feedback
© 2024 CSOFT International, Ltd.